Saiba aqui quanto pode pedir
Buildings least recent, for Sale, in Almada, with Solar Panels
Map
Order by
Least recent
Building
Cacilhas, Almada, Cova da Piedade, Pragal e Cacilhas, Distrito de Setúbal
Used · 525m²
With Garage
buy
1.750.000 €
Building under construction, with 3 fractions, parking floor and roof in Cacilhas / Seixal.
Building with the most sophisticated construction system, ICF - Insulated Concrete Forms, consisting of 4 T3 apartments, 1 floor per floor, consisting of the following areas:
Floor -1: Garage with 200m2
Floor 0: 3 bedroom apartment 200m2 with terrace 84m2
Floor 1: 3 bedroom apartment 135m2
Floor 3: 3 bedroom apartment 135m2
3rd Floor: 3 Bedroom Apartment 104m2 with Terrace and 1 Balconies
Common Areas: 125m2
Cover
Building with Elevator.
Solar Panels
Coated with light beige natural stone
White lacquered aluminum frames
A few minutes from Lisbon, this apartment is located in one of the most central streets of Almada, where you can find all kinds of commerce, services and public transport, as well as excellent road access.
Excellent Investment Opportunity.
CONSTRUCTION SYSTEM - ICF - Insulated Concrete Forms
Expected completion date: January 2025
Come and meet us.
For more information, please contact our Store or send a Contact Request
Building with the most sophisticated construction system, ICF - Insulated Concrete Forms, consisting of 4 T3 apartments, 1 floor per floor, consisting of the following areas:
Floor -1: Garage with 200m2
Floor 0: 3 bedroom apartment 200m2 with terrace 84m2
Floor 1: 3 bedroom apartment 135m2
Floor 3: 3 bedroom apartment 135m2
3rd Floor: 3 Bedroom Apartment 104m2 with Terrace and 1 Balconies
Common Areas: 125m2
Cover
Building with Elevator.
Solar Panels
Coated with light beige natural stone
White lacquered aluminum frames
A few minutes from Lisbon, this apartment is located in one of the most central streets of Almada, where you can find all kinds of commerce, services and public transport, as well as excellent road access.
Excellent Investment Opportunity.
CONSTRUCTION SYSTEM - ICF - Insulated Concrete Forms
Expected completion date: January 2025
Come and meet us.
For more information, please contact our Store or send a Contact Request
Contact
See Phone
Can’t find the property you’re looking for?
click here and leave us your request
, or also search in
https://kamicasa.pt